What does WTT mean in trains?
The working timetable (WTT) is the rail industry’s version of the public national timetable. It shows all movements on the rail network including freight trains, empty trains and those coming in and out of depots.
What is GTK rail?
GTK = Gross weight of train in tonnes multiplied by the distance it travels in kilometres.
What does GBR mean for Network Rail?
Great British Railways
Great British Railways (GBR) is a planned state-owned public body that will oversee rail transport in Great Britain from 2023, with the exception of Transport for London (TfL) services and light rail and trams elsewhere in England.
What is WTT and PTT in railway?
1665098-4: WTT = Working Time Table PTT = Passenger – Railway Enquiry.
What is WTT and RTT?
Forum Staff The WTT column is the Working Timetable which is the internal timetable that shows what’s supposed to happen and when whilst Realtime is what it actually managed in comparison to that.
What is railway payload?
Thus, the payload is a maximum of 58 tonnes with a tare of 25 tonnes, giving the rolling stock of the Indian Railways a payload to tare ratio of 2.32 as compared to a ratio of between 3.5 and 4 on most railway networks the world over.
What is train payload?
The term is borrowed from the transportation term that refers to the part of the load that pays for the transportation. Here’s an example: a train carries 30 tons of goods; these goods are considered the payload. Of course, the fully loaded train is heavier since there’s the driver, the train itself, and the fuel.
Does GBR replace Network Rail?
The Government’s plans is that GBR will replace Network Rail as the operator of rail infrastructure, and will also control the contracting of train operations, the setting of fares and timetables, and the collection of fare revenue in most of England.
Is Network Rail becoming GBR?
Network Rail will be absorbed into the new GBR organisation. GBR will also work closely with project promoters HS2 Ltd and East West Rail Co which will retain their current roles.
What does VST mean on realtime trains?
Thats more for VSTP- Very Short Term Planning. Short Term Planning is usually a few days to few weeks. Both STP and VSTP show as just “STP” in RTT. 14 Aug 2017.
What is an STP train?
A service marked ‘STP’ is a service that does not exist, at all, in the working timetable.
What is the loading capacity in SLR?
One SLR can carry upto 4 tonne of parcel. Facing a slow growth in freight, railways is exploring various ways to perk up the loadings including seeking suggestions from stakeholders, offering certain schemes and running special parcel trains.
What is the weight of train?
You can expect an average train weight to be about 3,000 to 18,000 tons or more depending on the load and number of cars in the train. Local trains designed for the transport of people or to carry less of a load may weigh anywhere from 1,500 to 6,000 tons or more.
What are Network Rail standards?
“Network Rail standards” is the generic term for the documents that specify requirements and provide guidance directed towards securing the safe and efficient operation of the rail infrastructure.
How do I access emergency changes on Network Rail standards?
Network Rail Standards Page 18 Issue 111: 02 March – 31 May 2019 2.3 Emergency Changes (Also Known As Letters of Instruction) To access any active Emergency Change you need to refer to its associated Network Rail Standard. The front page of the standard will provide details of the relevant change.
What are the changes to the rail industry standards?
The changes are to encourage greater innovation, cost efficiency and third-party funding into the rail network, whilst maintaining safety. We have already updated and streamlined many of our standards to reduce both complexity and cost, and to encourage innovation.
What is the Network Rail standards challenge application form?
The standards challenge application form can be used to submit a challenge to a Network Rail standard, policy, rule, specification, business process or work instruction that is considered to: (i) be incorrect; (ii) not enable the application of modern/best practice; or (iii) drive increased cost without comparable benefit.