What is drawing revision control?
With a good revision control system, you can pull the part drawing and identify what changes have been made throughout the part’s history and either roll the changes back or specifically call out the earlier revision that is desired.
What is revision number in drawing?
Sequence Number Use. When a revision involves two or more individual changes on a drawing, each change may be identified by a sequence number enclosed in parentheses preceding the description of the change.
Do you start at Rev 0 or Rev 1?
Re: Where does Revision Control Start Rev 0 or Rev 1 Both way is OK !
What is the purpose of revision number on the drawing and who issues a revised drawing?
Answer: In general, revisions numbers / versions 1 and 2 are for little changes and things in work, while revision letters are for major, released changes. When you make major changes, issue a formal revision letter change for the new drawing.
What are revisions in construction?
Changes that are made to the Construction Plans after the contract has been bid that require. formal documentation be made by the Engineer of Record are termed a construction revision.
How do you control engineering drawings?
Document control for engineering drawings is comprised of both document attributes and a defined control process. Engineering drawings, including technical documents such as specifications, procedures, will usually have these attributes: Owning organization, which is ultimately responsible for the document content.
How do you number revisions?
A revision number always has an even number of period-separated decimal integers. By default revision 1.1 is the first revision of a file. Each successive revision is given a new number by increasing the rightmost number by one.
What is the purpose of revision numbers?
Using revision dates and revision numbers are both common document control methods for identifying the current version of the document. Some companies use both dates and numbers.
How do you use revision numbers?
Use a ‘revision’ numbering system. Minor changes can be indicated by increasing the decimal figure for example, v01_01 indicates a minor change has been made to the first version, and v03_01 a minor change has been made to the third version.
What is a plan revision?
Revision is substantive. It involves clarifying your ideas by moving things around, adding material, and cutting. Your job in a revision plan is to decide specifically what you need to add, cut or move.
What is document Control Engineering?
What is document control engineering? Document control control engineering is the conscious process of developing systems and procedures which enable better document control.
How do you control a document?
Steps for starting a document control system
- Identify documents. Identify all the documents to be managed within the control system.
- Establish quality standards.
- Name your documents.
- Create revisions procedures.
- Manage access.
- Establish archiving procedures.
- Creation.
- Review.
What is a document revision?
The Document Revision Procedure outlines the procedure to follow for revising, adding, or deleting a document in the process management system. The Document Revision Form allows you to request that a document be revised, added or deleted in the process management system.
How does version control work?
Version control enables multiple people to simultaneously work on a single project. Each person edits his or her own copy of the files and chooses when to share those changes with the rest of the team. Thus, temporary or partial edits by one person do not interfere with another person’s work.
How do you write a revision in an architectural drawing?
Revision columns include the revision letter of the drawing, a short description of the changes made between this revision and the prior one, and the date the revision was made or the revised drawing was approved. Revision columns frequently include the drafter who made the latest revisions.
What is document control revision?
The method used to prevent the unintended use of non control documents or old documents. Any information that is used for Product Quality or the Quality Management System must be incorporated into the Document Control system. Within your Document Control Revision system, outline your numbering scheme for the documentation.
What is the maximum number of revision allowed in a drawing?
However, revision letters are not allowed to exceed two characters, so there is no revision greater than YY. At this point, you should issue a new drawing number. Revision columns are located in the upper right corner or next to drawing the title block.
What is revision control in electronics manufacturing?
A more simplified definition could be that revision control is a part’s road map. In the world of manufacturing electronics, it is critical that revisions of any product are properly maintained and controlled. You can end up making very costly, yet avoidable, mistakes if revision control is not taken seriously.